Repair of damaged oxygen line after explosion in 36 hours of time of copper pipe of 5 “diameter with process of welding of alloy for copper with stainless 225 ml.
BOF1 AHMSA I (Monclova, Coahuila.)
Supply and installation of 800 tons of cooling through chillers with the construction of 1500 m2 of multipanel to acclimatize electrical-electronic control panels.
NEMAK (Frontera, Coahuila)
Municipalities: Frontera, Monclova and Sanbuenaventura Coahuila. Completing an amount of 60,000 sqm of pavements and dirt roads.
GOVERNMENT OF THE STATE OF COAHUILA
Cleaning, clearing and shredding of waste, 103 hectares. Interior roads, cutting, preparation, bench material, compaction and testing, laying of low voltage lines, connection and support for panel assembly, junction paving.
PIMA SOLAR FV Park, Caborca Sonora. PRODIEL / IENOVA 160 MW
We implement a land clearing system in agricultural areas or areas with a low volume of plant material, pastures, crops, old planting areas, eliminating 100 of the volumes of plant material to be removed, reducing costs considerably with the elimination of carry-overs, cleaning 7 5 hectares per day.
FV MAGDALENA Park, Tlaxco Tlax. PRODIEL / ENEL 220 MW
Click the button and send us a message. We will gladly attend to your request.